Insprit provides the extended supports for preparing the drawings and approvals from the authority, your single point solutions.
• NOC - No objection certificate from DEWA for Green Project / Additional Load / Expansion or Modification up to 30 MW
• Design Approval - Design the required documents, power system calculations, submission to authority, meeting with the client and get the approval of project documents
• Inspection - After installation project, the electrical installation will be approved with Authority Inspector and obtain the report for further submission for receiving the power
• Power up - After completion of the all required to follow up with the respective department to receive the power for the project
As build drawing is additional activity which we support the client at the end of the projects
(The Gold rated DEWA approved contractor)
